Impact Environmental – Lotus Creek

Lotus Creek Wind Farm Protected Plant and Targeted Weed Survey 

Client:
Impact Environmental
Location:
Lotus Creek Wind Farm
Industry:
Renewables & Energy

Summary

In December 2024 Cowie undertook Protected Plant and Targeted Weed surveys along the proposed transmission line of Lotus Creek Wind Farm for Impact Environmental in preparation for clearing commencing early 2025. Cowie undertook a targeted threatened flora survey as part of the pre-clearance survey including but not limited to Cycad terryana and Sannantha brachypoda. Furthermore, locations of targeted weeds identified in the disturbance footprint were recorded as individuals and/or as polygon clusters. For all identified targeted weed species, a Weed Treatment Plan was developed and provided as part of the Pre-clearance Survey Report that outlined a proposed treatment schedule and control methodology.  Targeted weed species included:  

Lantana camara (Lantana). 

Opuntia stricta (Common Prickly Pear). 

Opuntia tomentosa (Velvety Tree Pear). 

Opuntia streptacantha (Westwood Pear).

The Pre-clearance Survey Report included the following:  

The survey methodology specific to each parameter. 

Outcomes of the field survey including georeferenced photographs. 

Detailed mapping showing: 

Locations of each parameter.

Vegetation clearing boundaries and identified/determined exclusion zones/ no-go zones. 

Recommendations on any further management measures required during vegetation clearing activities. 

Provision of Spatial Data.

Key Roles and Responsibilities

Principal Environmental Scientist

This role was responsible for overseeing the project management and outcomes, as well as directing workflow and organising the site survey. They ensured that all information that was necessary for successful completion of the field survey and subsequent reporting were completed in a safe, efficient and thorough manner. They reviewed all data and reports to ensure a high-quality product.

Suitably Qualified Ecologists

This role was split between two suitably qualified persons with extensive experience throughout Queensland and New South Wales. The ecologists undertook desktop assessments in preparation for the site surveys which were undertaken over 15 days with assistance of the graduate environmental consultant.

Graduate Environmental Consultant

This role was to support the ecologists during the field survey work, compile data and prepare the pre-clearance survey report in conjunction with the ecologists.

Key Outcomes

Development of in-house ecology team and capabilities and broadening of ecology experience.

Fine tune field work preparation, policies and procedures.

Related Projects

Discover other projects within this industry.

Sutton Beach Pavillion Redevelopment

Industry: Transport & Infrastructure
Scope: Ecological Survey

Acacia Park Design Support

Industry: Transport & Infrastructure
Scope: WWBW Development Approval Support

Hawsons Iron Project

Industry: Mining and Resources
Scope: Environmental Impact Statement (EIS) support

Inland Rail

Industry: Transport & Infrastructure
Scope: EIS Delivery Support Specialist

Inland Rail Narrabri to North Star (N2NS)

Sustainability support

Inland Rail Narrabri to North Star (N2NS)

Sustainability support

Inland Rail Narrabri to North Star (N2NS)

Sustainability support

Inland Rail Narrabri to North Star (N2NS)

Sustainability support